Power Your Future with Outdoor-Ready Energy Solutions

Empower your business with industry-leading energy storage systems engineered for outdoor installation. UL/TUV/CE certified with IP65 protection – safer than traditional indoor setups.

Factory-Direct Quality Assurance

5 EN-certified production lines • 3-stage QC protocol • EU warehouse in stock

✔️ Raw materials to final inspection

✔️ Dedicated EU logistics team

✔️ Custom bulk orders accepted

Why Global Partners Choose Us

With 13 years OEM experience, we guarantee 100% production transparency and batch consistency.

Outdoor Safety Design
IP65-rated all-weather protection system prevents dust/water ingress, extending equipment lifespan by 30% compared to indoor units.
Smart Energy Management
3-layer BMS monitors 14 parameters real-time with 99.9% prediction accuracy, optimizing energy utilization through AI algorithms.
Certified Compliance
Pre-installed with UL1973/IEC62619 certified modules, EU market-ready with full documentation package (including EN50330 avalanche test reports).
Fast Deployment
Pre-configured plug-and-play system reduces installation time by 60%. Support remote commissioning via HopeSolar PRO app.

Monitor your electricity usage anytime with our app.

Our app supports Apple and Android systems.

Features that we are super proud of

HopeSolar’s outdoor energy storage systems can be customized to meet your every need.

Flexible Modes

Multiple working modes can be set flexibly to meet different application needs.

Multi-Source Input

Built-in energy storage battery supports simultaneous access to load, grid, and photovoltaics for energy diversification.

Smart BMS

Advanced Battery Management System (BMS) predicts battery capacity and discharge time.

Autonomous Operation

Local Energy Management System (EMS) monitors system status in real-time and supports autonomous system operation.

Comprehensive Protection

Complete protection functions ensure the safe and reliable operation of the battery and inverter.

Multi-Layered Safety

Built-in fire protection, temperature control, and early warning systems provide multiple safety guarantees.

Versatile Communication

WiFi, CAN, and RS485 communication for convenient remote monitoring and management.

Long-lasting & Economical

4000+ cycle life (over 8 years), offering significant economic benefits, and automatic on-grid/off-grid switching.

Technical Parameters

Battery parameters
Battery capacity/kwh10.6kwh(16S208Ah)
Battery TypeLithium Iron Phosphate
BMS communicationCAN2.0 / 485
DC side voltage range/V44-57.6V
AC grid side input and output parameters
Rated power/KVA5KVA
Maximumcontinuous output current/AAC21.7A
Rated grid voltage/VAC230V,170-280V
Total harmonic distortion TDHUnder stable power<3%
Rated grid frequency/Hz50Hz/60Hz
Allowable grid frequency range/Hz±5Hz
power factor0.8 lead-0.8 lag
AC modeL+N+PE
Isolation methodNo isolation transformer
AC load side output parameters
Rated output voltage/VAC230V
Rated power/KVA5.2KVA
Rated frequency50/60Hz
Rated output current/AAC22.6A
Automatic switching time/ms≤20ms
Total harmonic distortion TDHUnder linear load <2%
Total harmonic distortion TDH10KW,2second
AC modeL+N+PE
Photovoltaic input (standard configuration)
Protection levelIP45
Fire Fighting SystemBuilt-in self-induction distributed fire extinguishing system
communication methodWIFI (optional), RS485+CAN
Thermal managementLow temperature heating (optional) + forced air cooling
EMSNo EMS
Weight (kg)About 240kg
DimensionsW*D*H/mm860.5x758x1037
Working temperature-20-55℃
Working environment humidity0-95%, no condensation
work noise≤70dB
Working altitude≤2000m
Interactive interfaceLCD/APP/PC
AC and DC starting functionhave
Diesel engine startingnone
STS switchOptional

Dimensions

1. The height of the concrete base on which the equipment is installed must ensure that it cannot be flooded by water under any circumstances, otherwise the energy storage equipment may be damaged and there is a risk of leakage;

2. Grounding resistance needs to be <4Ω;

3. All incoming and outgoing cables must enter and exit the cabinet through the side wiring holes;

Bottom installation diagram

The concrete base for installing the equipment needs to be pre-embedded with M12 bolts or expansion tubes at the position shown in the left picture; 

Quantity: Just choose 4 positions evenly among the 8 mounting holes

Want a free design?

Let's have a chat